I. General
1. These Procedures shall constitute an integral part of the Protocol on
Procedures Governing Replacement, Dismantling or Destruction, and Notification
Thereof, for ABM Systems and Their Components of July 3, 1974, and shall
be considered the second attachment to that Protocol. The Procedures shall
apply to ABM systems or their components, when they are being replaced
within a deployment area on the basis of Article VII of the Treaty on the
Limitation of ABM Systems of May 26, 1972, hereinafter referred to as the
Treaty, as well as when a deployment area of an ABM system or its components
is being exchanged on the basis of the Protocol to the Treaty of July 3,
1974.
2. Replacement of an ABM system or its components within a deployment area
or exchange of a deployment area of an ABM system or its components shall
be carried out so that components of an ABM system, as defined in Article
II of the Treaty, in their total number and composition, shall be consistent
with the provisions of Article III of the Treaty.
3. When an ABM system or its components are being replaced within a deployment
area or when a deployment area of an ABM system or its components is being
exchanged, for each type of component being deployed or replaced an event,
verifiable by national technical means, shall be identified which indicates
the initiation of its deployment or the initiation of its dismantling or
destruction. After such an event, a component correspondingly shall be
included in the number specified by the Treaty and Protocol thereto for
such components or shall be excluded therefrom.
4. Within a deployment area of an ABM system or its components replacement
of an ABM system shall be carried out by replacing its components. Dismantling
or destruction of components being replaced and deployment of replacement
components of an ABM system shall be carried out in accordance with the
provisions of Section II and III of these Procedures.
5. If a replacement component of an ABM system is deployed at the location
of the ABM system component being replaced, so that dismantling or destruction
of the latter is a necessary part of the construction or installation of
the replacement component, the manner and extent of dismantling or destruction
of the component being replaced shall be at the discretion of the Party
carrying out the replacement. Removal and replacement of ABM interceptor
missiles shall be carried out at the discretion of the Party carrying out
such replacement, subject to compliance with the provisions of Article
III of the Treaty.
6. Exchange of a deployment area of an ABM system or its components shall
be carried out through coordinated activities with respect to the dismantling
or destruction of the ABM system or its components in the area being exchanged
and with respect to the deployment of the ABM system or its components
in the replacement area pursuant to the provisions of the Protocol to the
Treaty and Section IV of these Procedures.
7. Notification of the replacement of components of an ABM system, both
within a deployment area and when the deployment area of an ABM system
or its components is being exchanged, shall be given twice annually in
the Standing Consultative Commission at the beginning of regular SCC sessions,
reflecting the actual status as of the beginning of that session and covering
the period since the last notification in the Commission.
In this connection, the Party carrying out the replacement shall notify
the other Party of the number and type (above-ground or silo) of ABM launchers,
of the number and type (large phased-array ABM radars or ABM radars with
a potential less than three million) of ABM radars, and of the number of
ABM radar complexes, on which dismantling or destruction has been completed
and is in process, and of the number of ABM launchers, ABM radars and ABM
radar complexes which have been replaced.
8. Notification of the exchange of the deployment area of an ABM system
or its components shall be given in the Standing Consultative Commission
pursuant to Article II of the Protocol to the Treaty. Such notification
shall be given before initiation within the replacement area of any construction
activities associated with the exchange of the deployment area of an ABM
system or its components and shall contain the time of initiation of these
activities as well as the location of the new deployment area (the direction
and distance to the new area in relation to the center of the area being
exchanged).
Upon completion of dismantling or destruction of the ABM system or its
components in the area being exchanged, the Party which has carried out
the exchange of the deployment area of the ABM system or its components
shall notify the other Party of having carried out the exchange of the
area, at the next regular session of the Standing Consultative Commission.
9. Each Party may on a voluntary basis add other information to the notifications
if it considers such information necessary to assure confidence in compliance
with the obligations assumed under the Treaty.
II. Procedures for ABM Launchers
1. Subject to compliance with the limitations provided for in the Treaty
and the Protocol thereto, ABM launchers may be replaced by above-ground
or silo ABM launchers within a deployment area as well as when the deployment
area of an ABM system or its components is being exchanged.
2. With respect to replacement of ABM launchers within a deployment area
of an ABM system or its components, as well as when the deployment area
is being exchanged:
(a) The beginning of any construction or assembly work, other than
earthwork (excavation), associated with the building of replacement ABM
launchers (above-ground and silo) shall constitute initiation of deployment
of these launchers, after which they shall be subject to the limitations
provided for in Article III of the Treaty.
(b) Removal from the launch site of all above-ground launcher elements,
and in addition, for a silo launcher, dismantling or destruction and removal
from the launch site of the silo door or cover and dismantling or destruction
of the headworks shall constitute initiation of dismantling or destruction
of ABM launchers (above-ground and silo) being replaced, after which they
shall not be subject to the limitations provided for in Article III of
the Treaty.
(c) Prior to initiation of dismantling or destruction of ABM launchers
(above-ground and silo) being replaced, all ABM interceptor missiles associated
with them, as well as the warheads for these interceptor missiles, shall
be removed from the launch site.
-
3. When carrying out dismantling or destruction of ABM launchers being
replaced, the following actions shall be accomplished:
(a) Above-ground launchers and associated equipment shall be removed
from the launch sites and the entire part of the launch pad containing
the launcher mount and reinforcements shall be dismantled or destroyed.
(b) Above-ground structures and headworks of ABM silo launchers shall
be dismantled or destroyed; dismantled or destroyed silo doors or covers,
as well as equipment associated with these launchers, shall be removed
from the launch sites. The silo shall be destroyed by dismantling or destroying
its concrete elements to a depth of at least five meters from the upper
edge of the headworks. The silo shaft shall remain open for at least six
months.
-
4. Deployment of replacement ABM launchers within the deployment area of
an ABM system or its components shall be initiated no earlier than initiation
of dismantling or destruction of the ABM launchers being replaced in that
area.
-
5. Dismantling or destruction of ABM launchers being replaced shall be
completed no later than three months after initiation thereof as defined
in subparagraph 2(b) of this Section of the Procedures. Debris remaining
after dismantling or destruction of ABM launchers (above-ground and silo)
may be removed, and after six months the former ABM launcher locations
may be covered with earth.
III. Procedures for ABM Radars and ABM Radar Complexes
-
1. Subject to compliance with the limitations provided for in the Treaty
and the Protocol thereto, ABM radars and ABM radar complexes may be replaced
within a deployment area, as well as when the deployment area of an ABM
system or its components is being exchanged.
ABM Radars
-
2. With respect to replacement of ABM radars within a deployment area of
an ABM system or its components, as well as when the deployment area is
being exchanged:
(a) The beginning of any construction or assembly work associated with
the building of antennas (arrays), ABM radar antenna structures, or antenna
pedestal supports which are not parts of ABM radar buildings shall constitute
initiation of deployment of replacement ABM radars, after which they shall
be subject to the limitations provided for in Article III of the Treaty.
(b) Removal or destruction of antenna protective covers, dismantling
or destruction of antennas (arrays) and antenna structures, as well as
opening of those parts of ABM radar buildings in which antennas (arrays)
had been mounted, shall constitute initiation of dismantling or destruction
of ABM radars being replaced, after which they shall not be subject to
the limitations provided for in Article III of the Treaty.
-
3. When carrying out dismantling or destruction of ABM radars being replaced,
the following actions shall be accomplished:
(a) ABM radar instruments and equipment shall be dismantled and removed
from the radar site.
(b) Antenna protective covers shall be dismantled or destroyed.
(c) ABM radar antennas (arrays) with their structures or with antenna
pedestal supports which are not parts of ABM radar buildings as well as
the pads occupied by the bases and reinforcements of such supports shall
be dismantled or destroyed. The dismantled elements shall be removed from
the ABM radar sites.
(d) Those parts of ABM radar buildings in which antennas (arrays) had
been mounted as integral parts thereof shall be opened and destroyed in
such a manner that there will remain no more than half of the perimeter
of the opening formed as a result of opening that part of the building
where antennas (arrays) had been mounted. The buildings shall remain in
such a condition for six months, after which they may be restored but not
beyond that level to which destruction is required.
(e) Debris remaining after completion of dismantling or destruction
of ABM radars may be removed after six months.
-
4. Deployment of replacement ABM radars within the deployment area of an
ABM system or its components shall be initiated no earlier than the initiation
of dismantling or destruction of the ABM radars being replaced in that
area, and shall be carried out in such a manner that it will not cause
the number of ABM radars to exceed the number specified in Article III,
subparagraph (b) of the Treaty, subject to compliance with the provisions
of that subparagraph and the applicable Agreed Statements concerning the
potential of radars.
-
5. Dismantling or destruction of ABM radars being replaced, which are components
of the ABM system currently deployed by each Party, shall be completed
without unreasonable delays no later than one year after initiation thereof
as defined in subparagraph 2(b) of this Section of the Procedures.
-
6. After dismantling or destruction of ABM radars has been completed in
accordance with the above procedures, facilities remaining at ABM radar
sites may, at the discretion of the Parties, be used for purposes which
are not inconsistent with the provisions of the Treaty.
ABM Radar Complexes
-
7. With respect to replacement of ABM radar complexes within a deployment
area of an ABM system or its components, as well as when the deployment
area is being exchanged:
(a) The initiation of deployment, as defined in subparagraph 2(a) of
this Section of the Procedures, of even one ABM radar of an ABM radar complex
being deployed shall constitute initiation of deployment of replacement
ABM radar complexes, after which they shall be subject to the limitations
provided for in Article III of the Treaty.
(b) The initiation of dismantling or destruction, as defined in subparagraph
2(b) of this Section of the Procedures, of all ABM radars of each ABM radar
complex being replaced shall constitute initiation of dismantling or destruction
of ABM radar complexes being replaced, after which they shall not be subject
to the limitations provided for in Article III of the Treaty.
-
8. Deployment of replacement ABM radar complexes within the deployment
area of an ABM system or its components shall be initiated no earlier than
the initiation of dismantling or destruction of ABM radar complexes being
replaced in that area, and shall be carried out in such a manner that it
will not cause the number of ABM radar complexes to exceed the number specified
in Article III, subparagraph (a) of the Treaty, subject to compliance with
the provisions of that subparagraph concerning the size and circular shape
of the area of each ABM radar complex.
-
9. Dismantling or destruction of ABM radar complexes being replaced shall
be completed by dismantling or destruction of all ABM radars of each ABM
radar complex being replaced in accordance with paragraph 3 of this Section
of the Procedures no later than one year after initiation thereof as defined
in subparagraph 7(b) of this Section of the Procedures.
IV. Procedures for Exchange of the Deployment Area of an ABM
System or its Components
-
1. When the deployment area of an ABM system or its components is being
exchanged, no construction activity associated with the deployment of an
ABM system or its components in the replacement area shall begin until
appropriate notification is given to the other Party pursuant to Article
II of the Protocol to the Treaty and Section I, paragraph 8, of these Procedures.
-
2. When the deployment area of an ABM system or its components is being
exchanged:
(a) Initiation of deployment, as defined in Section II, subparagraph
2(a) of these Procedures, of even one ABM launcher (above-ground or silo)
in the replacement area shall be carried out no earlier than completion
of the initiation of dismantling or destruction, as defined in Section
II, subparagraph 2(b) of these Procedures, of all ABM launchers in the
area being exchanged.
(b) Initiation of deployment, as defined in Section III, subparagraph
2(a) of these Procedures, of even one ABM radar, including one which is
part of an ABM radar complex, in the replacement area shall be carried
out no earlier than completion of the initiation of dismantling or destruction,
as defined in Section III, subparagraph 2(b) of these Procedures, of all
ABM radars, including those which are parts of ABM radar complexes, in
the area being exchanged.
-
3. Prior to completion of dismantling or destruction of 50 percent of the
number of ABM launchers, ABM radars or ABM radar complexes in the area
being exchanged, the Party carrying out the exchange may initiate deployment
of no more than 50 percent of the number of ABM launchers, ABM radars or
ABM radar complexes which is specified in Article III of the Treaty for
the replacement deployment area of an ABM system or its components.
-
4. Each Party may, at its discretion, completely dismantle or destroy the
ABM system and its components in the area being exchanged, and thereafter
deploy an ABM system or its components in the other area permitted in Article
III of the Treaty and the Protocol thereto, provided that, prior to initiation
of construction, notification is given pursuant to Article II of the Protocol
to the Treaty and Section I, paragraph 8, of these Procedures.
-
5. When the deployment area of an ABM system or its components centered
on the national capital is being exchanged, those non-phased-array ABM
radars which were operational within that area on the date of signature
of the Treaty shall be dismantled or destroyed.
-
When carrying out dismantling or destruction of these ABM radars, the following
actions shall be accomplished:
(a) Antenna protective covers shall be dismantled or destroyed.
(b) Antennas, antenna structures and ABM radar equipment shall be dismantled
and removed from the radar site.
-
Buildings and facilities remaining after dismantling or destruction of
these ABM radars may be used for purposes not inconsistent with the provisions
of the Treaty.
-
Dismantling or destruction of these ABM radars shall be completed no later
than accomplishment of the other actions provided for in these Procedures
for exchange of the deployment area of an ABM system or its components.
-
6. Dismantling or destruction of ABM launchers, ABM radars and ABM radar
complexes within the area being exchanged shall be carried out in accordance
with Section II, paragraphs 3 and 5, and Section III, paragraphs 3, 5 and
9 of these Procedures.
|