I. Procedures for Elimination of Heavy ICBMs and Their Launch Canisters
(b) may remove the electronic and electromechanical devices of the missile's guidance and control system from the missile and its launch canister, and other elements that shall not be subject to elimination pursuant to paragraph 4 of this Section;
(c) shall remove the missile from its launch canister and disassemble the missile into stages;
(d) shall remove liquid propellant from the missile;
(e) may remove or actuate auxiliary pyrotechnic devices installed on the missile and its launch canister;
(f) may remove penetration aids, including devices for their attachment and release; and
(g) may remove propulsion units from the self-contained dispensing mechanism.
These actions may be carried out in any order.
(b) the self-contained dispensing mechanism as well as the front section, including the reentry vehicle platform and the front section shroud, shall be cut into two pieces of approximately equal size and crushed.
| II. | Procedures for Conversion of Silo Launchers of Heavy ICBMs, Silo Training Launchers for Heavy ICBMs |
(b) concrete shall be poured into the base of the silo launcher up to the height of five meters from the bottom of the silo launcher; and
(c) a restrictive ring with a diameter of no more than 2.9 meters shall be installed into the upper portion of the silo launcher. The method of installation of the restrictive ring shall rule out its removal without destruction of the ring and its attachment to the silo launcher.
(ii) upon completion of all of the procedures provided for in paragraph 4 of this Section; and
(b) the inspecting Party shall have the right to implement the procedures provided for in either paragraph 6 or paragraph 7, but not both, of this Section for each silo launcher of heavy ICBMS, silo training launcher for heavy ICBMS, and silo test launcher for heavy ICBMs that is to be converted.
(b) immediately prior to the commencement of the process of pouring concrete, the converting Party shall take such steps as are necessary to ensure that the base of the silo launcher is visible, and that the depth of the silo can be measured;
(c) the inspecting Party shall have the right to observe the entire process of pouring concrete from a location providing an unobstructed view of the base of the silo launcher, and to confirm by measurement that concrete has been poured into the base of the silo launcher up to the height of five meters from the bottom of the silo launcher. The measurements shall be taken from the level of the lower edge of the closed silo launcher door to the base of the silo launcher, prior to the pouring of the concrete, and from the level of the lower edge of the closed silo launcher door to the top of the concrete fill, after the concrete has hardened;
(d) following notification of completion of the procedures provided for in paragraph 4 of this Section, the inspecting Party shall be permitted to measure the diameter of the restrictive ring. The restrictive ring shall not be shrouded during such inspections. The Parties shall agree on the date for such inspections;
(e) the results of measurements conducted pursuant to subparagraphs © and (d) of this paragraph shall be recorded in written, factual inspection reports and signed by the inspection team leader and a member of the in-country escort;
(f) inspection teams shall each consist of no more than 10 inspectors, all of whom shall be drawn from the list of inspectors under the START Treaty; and
(g) such inspections shall not count against any inspection quota established by the START Treaty.
(b) immediately prior to the commencement of the process of pouring concrete, the converting Party shall take such steps as are necessary to ensure that the base of the silo launcher is visible, and that the depth of the silo launcher can be measured;
(c) the inspecting Party shall measure the depth of the silo launcher prior to the commencement of the process of pouring concrete;
(d) following notification of completion of the procedures provided for in paragraph 4 of this Section, the inspecting Party shall be permitted to measure the diameter of the restrictive ring, and to remeasure the depth of the silo launcher. The restrictive ring shall not be shrouded during such inspections. The Parties shall agree on the date for such inspections;
(e) for the purpose of measuring the depth of the concrete in the silo launcher, measurements shall be taken from the level of the lower edge of the closed silo launcher door to the base of the silo launcher, prior to the pouring of the concrete, and from the level of the lower edge of the closed silo launcher door to the top of the concrete fill, after the concrete has hardened;
(f) the results of measurements conducted pursuant to subparagraphs (c), (d), and (e) of this paragraph shall be recorded in written, factual inspection reports and signed by the inspection team leader and a member of the in-country escort;
(g) inspection teams shall each consist of no more than 10 inspectors, all of whom shall be drawn from the fist of inspectors under the START Treaty; and
(h) such inspections shall not count against any inspection quota established by the START Treaty.
III. Equipment; Costs
DONE at Moscow on January 3, 1993, in two copies, each in the English and Russian languages, both texts being equally authentic.
| FOR THE UNITED STATES OF AMERICA: | FOR THE RUSSIAN FEDERATION: |
I. Exhibitions of Heavy Bombers
(b) the date for such an exhibition shall be agreed upon between the Parties through diplomatic channels, and the exhibiting Party shall communicate the location of the exhibition;
(c) during such an exhibition, each heavy bomber exhibited shall be subject to inspection for a period not to exceed two hours;
(d) the inspection team conducting an inspection during an exhibition shall consist of no more than 10 inspectors, all of whom shall be drawn from the list of inspectors under the START Treaty;
(e) prior to the beginning of the exhibition, the inspected Party shall provide a photograph or photographs of one of the heavy bombers of a type or variant of a type reoriented to a conventional role and of one of the heavy bombers of the same type and variant of a type that were reoriented to a conventional role and subsequently returned to a nuclear role, so as to show all of their differences that are observable by national technical means of verification and visible during inspection; and
(f) such inspections during exhibitions shall not count against any inspection quota established by the START Treaty.
II. Inspections of Heavy Bombers
(b) to conduct inspections of heavy bombers reoriented to a conventional role, in order to confirm the differences of such heavy bombers from other heavy bombers of that type or variant of a type that are observable by national technical means of verification and visible during inspection. The inspection team shall have the right to visually inspect those portions of the exterior of the inspected heavy bomber having the differences observable by national technical means of verification and visible during inspection, but not to inspect other portions of the exterior or interior; and
(c) to conduct inspections of heavy bombers that were reoriented to a conventional role and subsequently returned to a nuclear role, in order to confirm the differences of such heavy bombers from other heavy bombers of that type or variant of a type that are observable by national technical means of verification and visible during inspection, and to confirm that the number of nuclear weapons for which a heavy bomber is actually equipped does not exceed the number specified in the Memorandum on Attribution. The inspection team shall have the right to visually inspect those portions of the exterior of the inspected heavy bomber where the inspected heavy bomber is equipped for weapons, as well as to visually inspect the weapons bay of such a heavy bomber, and to visually inspect those portions of the exterior of the inspected heavy bomber having the differences observable by national technical means of verification and visible to inspection, but not to inspect other portions of the exterior or interior.
| FOR THE UNITED STATES OF AMERICA: | FOR THE RUSSIAN FEDERATION: |