The Bushehr Nuclear Power Plant (BNPP) is Iran's first commercial nuclear reactor. In 1994, Tehran and Moscow signed an agreement to construct the VVER 1000MWe light-water reactor, and construction started the same year. [1]
 
Iran had previously attempted to build a nuclear power plant at the Bushehr site, and in 1974 contracted the German company Siemens (then KraftWerk) to build two reactors. The first unit was approaching completion when Iran halted the project as a result of the 1979 Iranian revolution. [2] During the Iran-Iraq war, the reactors sustained severe damage in an Iraqi bombing raid. [3] After the war, Siemens refused to continue with construction in the face of extreme diplomatic pressure from the United States.
 
The Bushehr Nuclear Power Plant is unique in design because Russia agreed to incorporate its VVER technology into the original German-built infrastructure. [4] In a series of shipments between December 2007 and January 2008, Iran received a total of 82 tons of fuel from Russia for the initial fuel loading of the BNPP. [5] The IAEA has arranged to verify and seal the fresh fuel shipments, and all the fuel assemblies imported from Russia for use at the Bushehr plant remain under Agency seals before being loaded into the reactor. [6] Iran is required to return spent fuel rods from Bushehr to Russia as soon as they are safe for transport. [7] Indicating that the plant was nearing completion, engineers conducted a series of pre-start tests in 2009 and 2010. [8]
 
Loading of fuel into the reactor core was finished in November 2010. [9] However, in February 2011 Iran informed the IAEA that the fuel would have to be removed. [10] A broken pump had caused small metal particles to infiltrate the reactor's cooling system, and it was feared that the particles might have made their way into the fuel assemblies. [11] It was speculated that the Stuxnet computer virus had caused damage to the facility. [12] In April 2011, the fuel was reloaded into the reactor. [13] The following month, the Bushehr plant began operating at low levels. [14] On February 11, 2012 the plant was connected to the national grid, generating 700 megawatts of electricity. That same month, Iranian Atomic Energy Organization chief Fereydoun Abbasi-Davani announced that the plant would operate at full capacity starting in late March 2012. [15]
 
In 2013, a 6.3 magnitude earthquake hit the southwest region of Iran, where Bushehr is located. [16] Given that much of Iran is in a seismic zone, many expressed concerns over Bushehr's safety following the earthquake. For example, the United Arab Emirates and Saudi Arabia voiced concerns at the IAEA Board of Governors meeting in June 2013. [17] Iran denied allegations concerning the plant's safety "vulnerability." [18] Simultaneously, Iran reported an electric generator malfunction and "long cracks […] in at least one section of the structure." However, Tehran dismissed the suggestion that the malfunction was connected to the earthquake. [19] The IAEA's May 2013 report indicated that the reactor was shut down during its inspections on May 11 and 12, 2013. [20] IAEA Director General Yukiya Amano later stated that the IAEA had no information regarding the causes of the plant's shutdown. The IAEA's August 12, 2013 inspection of the Bushehr Nuclear Power Plant indicated that the reactor was operating at 100% of capacity. [21]
 
On November 24, 2013, the E3/EU+3 talks in Geneva resulted in the Joint Plan of Action (JCPA), which allowed the IAEA 24-hour access to the Bushehr Nuclear Power Plant for inspections. [22] On July 14, 2015, the E3/EU+3 and Iran finalized the Joint Comprehensive Plan of Action (JCPOA). [23] The JCPOA does not specifically mention the Bushehr nuclear facility, but the agreement stipulates that Iran intends to ship out all spent nuclear fuel and will not engage in spent fuel reprocessing for 15 years. [24]
 
On September 10, 2016, Iranian officials held a groundbreaking ceremony for the construction of an additional two nuclear reactors in the same complex, anticipating completion within ten years with Russian help. [25] At the ceremony, the head of the AEOI, Dr. Salehi, declared that construction would abide by IAEA safeguards. [26] The two 1000MWe reactors will be AES-92 Generation III+ VVER pressurized-water reactors, and will also power two desalination plants. [27] The Atomic Energy Organization of Iran predicts that nuclear power will provide between 8 and 10 percent of the country's electricity after these plants come online. [28]
 
Representatives of Rosatom's nuclear fuel division signed a contract with the AEOI on June 19, 2017 for the Russian company to deliver reserve fuel for the Bushehr nuclear power plant in late 2017, an indication of the ongoing nuclear partnership between Russia and Iran. [29]
 
Sources:
[1] "Nuclear Energy in Iran," World Nuclear Association, www.world-nuclear.org.
[2] "Nuclear Energy in Iran," World Nuclear Association, www.world-nuclear.org.
[3] Robert Tait, "Iran Makes First Test-Run of Bushehr Nuclear Reactor," The Guardian, January 25, 2009, www.guardian.co.uk.
[4] "Bushehr Enclosure Leak-Tested," February 16, 2010, World Nuclear News, www.world-nuclear-news.org.
[5] "Iran receives final shipment of fuel for Bushehr," January 28, 2008, World Nuclear News, www.world-nuclear-news.org.
[6] "Iran receives final shipment of fuel for Bushehr," January 28, 2008, World Nuclear News, www.world-nuclear-news.org.
[7] "Bushehr Nuclear Power Plant," Institute for Science and International Security (ISIS), www.isisnucleariran.org.
[8] "Iranian Reactor Completes Latest Pre-Start Tests," January 12, 2010, World Nuclear News, www.world-nuclear-news.org.
[9] "Iran completes fueling Bushehr reactor," PressTV, December 1, 2010, www.presstv.ir.
[10] "Iran nuclear plans: Bushehr fuel to be unloaded," BBC, February 26, 2011, www.bbc.co.uk.
[11] William J. Broad, "Russians Say Damaged Cooling Pump Is Cause of Delay in Starting Iranian Reactor," The New York Times, February 28, 2011.
[12] "Iran nuclear plans: Bushehr fuel to be unloaded," BBC, February 26, 2011, www.bbc.co.uk.
[13] Ali Akbar Dareini, "Russia: Fuel Loading Resumes at Bushehr," The Associated Press, April 8, 2011.
[14] "Iran's Bushehr nuclear plant begins operation," BBC, May 10, 2011, www.bbc.co.uk.
[15] Ladane Nasseri, "Iran's Bushehr Nuclear Plant to Work at Full Capacity, IRNA Says," Bloomberg, February 26, 2012.
[16] "Deadly quake in south-west Iran's Bushehr province," BBC, April 10, 2013, www.bbc.co.uk.
[17] "Iran's Gulf Arab neighbors worried about Bushehr reactor," Al Arabiya, June 6, 2013, www.alarabiya.net.
[18] "Iran dismisses hype on Bushehr plant's 'vulnerability,'" PressTV, June 10, 2013, www.presstv.ir.
[19] "Iranian ambassador: Russia-built Bushehr nuclear plant suffered electric generator malfunction," Washington Post, June 10, 2013, www.washingtonpost.com.
[20] International Atomic Agency Organization, "Implementation of the NPT Safeguards Agreement and relevant provisions of Security Council resolution in the Islamic Republic of Iran," Report by the Director General, May 22, 2013, www.iaea.org.
[21] International Atomic Energy Agency, "Implementation of the NPT Safeguards Agreement and relevant provisions of Security Council resolutions in the Islamic Republic of Iran," GOV/2013/56, November 14, 2013.
[22] "Iran Nuclear Deal: Joint Plan of Action-Full Document," via: The Guardian, November 24, 2013, www.theguardian.com.
[23] "Joint Comprehensive Plan of Action," US Department of State, July 14, 2015, www.state.gov. 
[24] "Joint Comprehensive Plan of Action," US Department of State, July 14, 2015, www.state.gov.
[25] "Inauguration of two new power plant units construction in Bushehr," Press Release by the Atomic Energy Organization of Iran, September 18, 2016, www.aeoi.org.ir. 
[26] "Inauguration of two new power plant units construction in Bushehr," Press Release by the Atomic Energy Organization of Iran, September 18, 2016, www.aeoi.org.ir.
[27] "Nuclear Power in Iran," World Nuclear Organization of Iran, April 2017, accessed June 26, 2017, www.world-nuclear.org.
[28] "Conference on JCPOA and Economic of Resistance held in foreign ministry," Press Release by the Atomic Energy Organization of Iran, May 15, 2017, www.aeoi.org.ir.
[29] "Rosatom Fuel Company TVEL and Atomic Energy Organisation of Iran have signed the Fuel Supple Contract for the reserve refueling at ATOMEXPO'2017," Press Release by TVEL, June 20, 2017, www.tvel.ru. 
Country Profile
Flag of Iran
Iran

This article provides an overview of Iran's historical and current policies relating to nuclear, chemical, biological and missile proliferation.

Learn More →

This material is produced independently for NTI by the James Martin Center for Nonproliferation Studies at the Middlebury Institute of International Studies at Monterey and does not necessarily reflect the opinions of and has not been independently verified by NTI or its directors, officers, employees, or agents. Copyright 2017.